Logo
Oil field chemical production equipment and pipeline facilities, Shandong Youwei petroleum science and technology core business scene

Core Business

The trinity of oil field chemical auxiliaries, downhole tools and field engineering and technical services provides customized solutions for the whole life cycle of oil and gas field exploration and development.

Three major business systems, covering the whole chain of oil and gas development

Oil field chemical production equipment and reagent storage tank for the production of oil field special chemicals such as demulsifier, corrosion inhibitor and so on

Oil Field Chemicals

It covers a full range of oil field special chemicals such as demulsifier, pour point depressant, corrosion inhibitor and desulfurizer, which is suitable for complex working conditions such as gathering pipelines, central treatment stations and produced water treatment, to cope with the challenges of high salt, high hydrogen sulfide content and low temperature heavy oil transportation.

For Details
Refinery chemical production and testing scene, used for refining auxiliaries such as cetane number improver, gasoline antiknock agent, etc.

Refinery Chemicals

Refining auxiliaries such as cetane number improver, gasoline antiknock agent, diesel antiwear agent and FCC metal passivator help refineries improve quality and efficiency, and meet the needs of clean oil production and long-term operation of the unit.

For Details
Oil field process equipment and downhole operation tools, including pry-mounted drug feeding equipment, sand control screen pipe, pressure pulse generator, etc.

Process equipment and working tools

Independent patented products such as pry-mounted drug feeding equipment, sand control screen tube, pressure pulse generator and well washing converter provide reliable tool guarantee for oil and gas field operation and support standardized production and customized research and development.

For Details

Chemical technical service process

01

Sample detection and screening

The water sample testing and pharmaceutical compatibility experiments were carried out according to the crude oil, produced water and field working conditions, and the suitable pharmaceutical formulation direction was determined from the source.

02

Formula optimization and pilot test

Relying on the production capacity of independent chemical agents and the joint laboratory, the formulation optimization and field pilot test were completed to verify the treatment effect of the agents under real working conditions.

03

Addition scheme and on-site debugging

Combine the dosing equipment and technological process to formulate the dosing plan, complete the on-site installation and commissioning, and ensure that the medicament plays a stable role in the gathering, transportation and treatment link.

04

Full follow-up and after-sale

Provide full-process technical guidance and after-sales tracking service, and continuously adjust the medicament scheme according to on-site feedback to ensure the stable operation of the whole life cycle of oil and gas fields.